Three-Phase AC Industrial Motor Rewinding & Repair

Professional inspection, rewinding, repair and refurbishment of three-phase AC electric motors used in pumps, conveyors, fans, compressors, production machinery and industrial equipment.

Available for small, medium and large industrial motors subject to technical assessment.

Alpha Industrial Works provides inspection, rewinding, mechanical repair and refurbishment services for three-phase AC induction motors used throughout industrial and commercial applications.

Motor failure may result from winding breakdown, insulation deterioration, overheating, bearing failure, contamination, electrical faults or mechanical damage.

Each motor is assessed before repair to determine the required electrical and mechanical work.

Where appropriate, the motor can be stripped, cleaned, rewound, insulated, mechanically repaired, reassembled, tested and refinished before being returned to service.

Motor Size

Up to 3 kW
3–15 kW
15–75 kW
75–250 kW
250 kW+
Specialised large motors – subject to assessment

Work We Can Perform

  • Motor inspection
  • Motor stripping
  • Stator rewinding
  • Coil replacement
  • Winding data recording
  • Insulation replacement
  • Lead and terminal repair
  • Bearing replacement
  • Bearing housing inspection
  • Shaft inspection
  • Shaft repair and machining
  • Keyway repair
  • End-shield repair
  • Dynamic balancing where required
  • Cleaning and degreasing
  • Varnishing / insulation treatment
  • Reassembly
  • Electrical testing
  • Mechanical inspection
  • Industrial repainting
  • Final inspection

Typical Applications

Conveyors
Industrial pumps
Fans
Blowers
Compressors
Crushers
Mixers
Production equipment
Machine tools
Process equipment

Industries

Mining
Manufacturing
Engineering
Water treatment
Food processing
Material handling
Steel
Construction
Quarrying
Industrial maintenance

Customer Quotation Requirements

Please provide:

Motor nameplate photo
Motor photographs
Power rating in kW or HP
Voltage
RPM
Application
Description of failure
Quantity
Site/location
Required completion date